Non-exhaustive list of recent works related to BIM technology (*):
*Some works are not showed in detail according to the agreement stablished with the client in terms of confidentiality.

1-WORKS
2-PUBLICATIONS
3-AWARDS
4-CONVENTIONS
5-CONFERENCES
6-SPONSORSHIPS
7-OTHER INITIATIVES

WORK: Autonomous robotics for inspection and evaluation of existing buildings with BIM technology.
MISSION: Strategical Project for business research, leading the part of BIM and connection to database. The Project will be executed by the consortium of the following companies: FCC, GEOCYSA, EUROESTUDIOS, INSYTE E IMATIA.
DATE: November 2016-December 2020
CLIENT: CDTI (Center for Technological and Industrial Development)

WORK: Basic projects for 25, 50 and 50 housing in Denia, Alicante (Spain)
MISSION: Architecture and landscaping modelling, useful and construction areas and plans design for visa at a basic project level.
DATE: May 2017-June 2017
CLIENT: EAP arquitectura [EAP architecture]

WORK: Preliminary project for 226 housing in Valencia (Spain)
MISSION: Architecture and landscaping modelling, useful and construction areas, plans design, 4D construction simulation, mock-up (3D printing of the BIM model) and corporate video for tender at a preliminary project level. Advance charts for residential units management. Result: 1st prize
DATE: April 2017-June 2017
CLIENT: EAP arquitectura [EAP architecture]

WORK: Basic project for a hotel refurbishment in Málaga (Spain)
MISSION: Architecture and landscaping modelling, useful and construction areas and plans design for visa at a basic project level.
DATE: March 2017-April 2017
CLIENT: EAP arquitectura [EAP architecture]

WORK: Modelling of sewage treatment plant in Vistabella, Castellón (Spain)
MISSION: Architecture, installations and landscaping modelling, plans design and charts for presentation at a preliminary project level.
DATE: February 2017-April 2017
CLIENT: CVI Control de vertido industrial [Industrial waste control]

WORK: Modelling for intervention in sanitary installations in Elche Court House, Alicante (Spain)
MISSION: Sanitary installations modelling, plans design and charts for presentation at an execution project level.
DATE: April 2017-June 2017
CLIENT: CVI Control de vertido industrial [Industrial waste control]

WORK: Navisworks training day for EUIPO (European Union Intellectual Property Office), Alicante (Spain)
MISSION: Introduction to Navisworks for works management from different points of view: Project management, contractor and property.
DATE: January 2017
CLIENT: Arqueha

WORK: Head office of leading company in the banking sector, Madrid (Spain)
MISSION: Architecture and Installations modelling, Digital Book of Building and data logging into the Model for Asset Management (Facility Management) using a digital database associated with the model (As Built Phase)
DATE: April 2015-March 2016
CLIENT: Sener

WORK: BIM modelling of the railway infrastructure buildings in Doha (Qatar)
MISSION: Modelling and structural plans
DATE: April 2016-February 2017
CLIENT: Valter

WORK: BIM modelling of Multifunctional building, Silla (Spain)
MISSION: Modelling and structural plans
DATE: April 2016-February 2017
CLIENT: Valter

WORK: Reparameterisation of specialized BIM content.
MISSION: parameters reasignation by programming in C# thought the Application Programming Interfaces (API) for Revit
DATE: December 2016- March 2016
CLIENT: Jimten

WORK: BIM Modelling of Headquarters building, Alicante (Spain)
MISSION: BIM Management and Architecture and Installations modelling
DATE: February 2016- June 2016
CLIENT: Typsa & Rubio Arquitectura

WORK: Apartment building 529 metres high in Dubai (Arabic Emirates)
MISSION: BIM Management and Installations modelling
DATE: December 2014- September 2015

WORK: Several underground stations, Riad (Saudi Arabia)
MISSION: BIM Management and Installations modelling
DATE: January 2015- February 2016 (current)
CLIENT: Typsa

WORK: Civic Center “Parquesol”, Valladolid (Spain)
MISSION: BIM Management and Architecture, Structure and Installations modelling. BOQ and Works/construction schedule linked to BIM Model.
DATE: November 2015- January 2016
CLIENT: City council of Valladolid

WORK: Civic Center “La Victoria”, Valladolid (Spain)
MISSION: BIM Management and Architecture, Structure and Installations modelling. BOQ and Construction schedule linked to BIM Model. Model for construction (Tender)
DATE: April 2015- May 2016
CLIENT: City council of Valladolid

WORK: University including Rectorate building and students residence, Congo (Africa)
MISSION: BIM Management and Architecture, Structure and Installations modelling.
DATE: April 2015- May 2015

WORK: Head office of leading company in the banking sector, Madrid (Spain)
MISSION: Architecture and Installations modelling (Technical BIM Expert on site, during phase 2 of construction)
DATE: June 2014- February 2015

WORK: Housing Building, Nador (Morocco)
MISSION: Architecture, Structure and Installations modelling according to the project documentation provided in Cad format.
DATE: October 2014- December 2014
CLIENT: Inmonord

WORK: Shopping Center, Madrid (Spain)
MISSION: Building envelope modelling to create a photorealistic commercial rendering.
DATE: October 2014
WORK: BIM Projects development in collaboration with technical office, Puzol (Spain)

MISSION: Development of projects created with Revit (Architecture, Structure, Installations and BOQ)
DATE: April 2014- October 2014
CLIENT: Phi Design

WORK: BIM Projects development in collaboration with technical office, Valencia (Spain)
MISSION: Development of projects created with Revit (Architecture)
DATE: June 2014
CLIENT: Bac Estudio

WORK: Secondary school, Santander (Spain)
MISSION: Installations modelling and management with Navisworks. Construction model.
DATE: April 2014 - May 2014

WORK: Participation in refurbishment works of existing public building, Valencia (Spain)
MISSION: Building skin modelling to create a photorealistic commercial rendering.
DATE: February 2014

WORK: Tunnel infrastructure under the sea to connect Denmark with Germany (Femern)
MISSION: BIM Manager and BIM modelling of the manufacturing plant dedicated to produce prefabricated structure
DATE: January 2014 – April 2014

WORK: Competition for the remodeling of public and residential equipment, Nyon (Switzerland)
MISSION: Modelling with Revit and 3D Max.
DATE: October 2013
CLIENT: Opta arquitectura

WORK: Municipal Trinquete Court, Gandia (Spain)
MISSION: Execution Project modelled with Revit (Architecture, Structure and Installations)
DATE: September 2013
CLIENT: Gandia City Council

WORK: Railway facilities, Lima (Peru)
MISSION: Several Metro Stations Structure modelled with Revit Structure
DATE: August 2013
CLIENT: Sener

WORK: Design, analysis and modelling of a Masterplan Concept Design, Luodai (China)
MISSION: Design with Revit, 3D Max and Lumion for preliminary project proposal
DATE: April 2013 – May 2013
CLIENT: The Clover

WORK: Building in the Tenerife Science and Technology Park (Spain)
MISSION: Project Competition with Revit, 3D Max, Lumion and Navisworks
DATE: March 2013
CLIENT: PCTT, S.A.

WORK: Sewage Treatment Plant using containers (Spain)
MISSION: Installations and container design with Revit MEP
DATE: April 2012
CLIENT: Industrial Waste Control

WORK: Pipes and Fittings technical catalogue
MISSION: Specialised BIM content modelling
DATE: February 2015 - April 2015
CLIENT: Italsan

WORK: Integral BIM training for professional group
MISSION: BIM Training (Revit Architecture, Revit Structure and Revit MEP, BOQ using BIM Technology and BIM Management with Navisworks)
DATE: October 2014 - June 2017 (4 editions)
CLIENT: Colegio Territorial de Arquitectos de Valencia [College of Architects of Valencia]

WORK: Master in BIM Construction Information Management (Interuniversity)
MISSION: BIM Training (Revit Architecture, Revit Structure and Revit MEP), BIM Management with Navisworks, BOQ using BIM Technology and standarisation (Visual programming with Dynamo and thought the Application Programming Interfaces (API) for Revit in C#)
DATE: October 2014 - May 2017 (2 editions)
CLIENT: Universidad Politécnica de Valencia - Universidade da Coruña [Polytechnic University of Valencia – University of A Coruña]

WORK: BIM Training and Implementation in a Company Technical Office
MISSION: Initiation to BIM, practice and BIM implementation into its own projects
DATE: February 2015 - June 2015
CLIENT: Citygas

WORK: BIM Training and Implementation in a Company Technical Office
MISSION: Initiation to BIM, practice and BIM implementation into its own projects
DATE: November 2014 – December 2014
CLIENT: Habitania

WORK: Basic BIM Training for technical personnel
MISSION: Initiation to BIM technology and workflow analysis oriented to the Company product
DATE: April 2015
CLIENT: Leica Geosystems

WORK: Basic BIM Training for teachers (Consellería de Educación)
MISSION: BIM training with Revit Architecture
DATE: 1st edition: May 2014 - June 2014; 2nd edition: April 2015 - May 2015
CLIENT: CEFIRE (Servicio de Formación de Profesorado de la Consellería Valenciana de Educación) [Teacher training service of the “Consellería Valenciana de Educación”]

WORK: Integral BIM training for professional group (Proper title ETSAM [ Superior Technical School of Architecture of Madrid])
MISSION: BIM training with Revit MEP (Mechanical, Electrical and Plumbing)
DATE: October 2014 - January 2017 (5 editions)
CLIENT: Escuela Técnica Superior de Arquitectura de Madrid [Superior Technical School of Architecture of Madrid]

WORK: Advance BIM training for professional group (BIM Master with Autodesk Revit)
MISSION: BIM training with Revit (Structure and Installations) and BIM Management with Navisworks
DATE: March 2015 - May 2015
CLIENT: Animum Creativity Advanced School

WORK: BIM Training and Implementation in a Company Technical Office
MISSION: Initiation to BIM technology, practice and BIM implementation into its own projects
DATE: November 2013 - March 2014
CLIENT: Unicon Development

WORK: BIM Training in a Company Technical Office
MISSION: BIM Management with Navisworks
DATE: January 2015
CLIENT: Ghesa ingeniería

WORK: Basic BIM Training in a Company Technical Office
MISSION: Initiation to BIM with Revit MEP (Mechanical, Electrical and Plumbing)
DATE: December 2014
CLIENT: Dragados

WORK: BIM Training and Implementation in a Company Technical Office
MISSION: Initiation to BIM with Revit MEP (Mechanical, Electrical and Plumbing)
DATE: April 2014
CLIENT: OHL

WORK: Workflow presentation with Autodesk Revit
MISSION: Remote connection with Revit (Estructure and Installations) in collaboration with BIM Ibérica
DATE: April 2014
CLIENT: Ferrovial

WORK: Basic BIM Structure Training
MISSION: Initiation to BIM with Revit Structure and SAP
DATE: April 2014
CLIENT: Universidad Politécnica de Valencia [Polytechnic University of Valencia]

WORK: Basic BIM Training and relationship between BIM and landscaping
MISSION: Initiation to BIM with Revit Architecture
DATE: March 2014
CLIENT: Universidad Politécnica de Valencia [Polytechnic University of Valencia]

WORK: BIM Training in a Company Technical Office
MISSION: BIM Management with Navisworks
DATE: February 2014
CLIENT: Arup

WORK: Basic BIM Training
MISSION: Initiation to BIM with Revit Architecture
DATE: 2012-2014 (7 editions)
CLIENT: Universidad Politécnica de Valencia [Polytechnic University of Valencia]

WORK: Basic BIM Training
MISSION: BIM applied to architecture projects with Revit Architecture
DATE: 2011-2014 (11 editions)
CLIENT: Colegio de Arquitectos de Valencia [College of Architects of Valencia]

WORK: Basic BIM Training
MISSION: BIM applied to architecture projects with Revit Architecture
DATE: November 2014
CLIENT: Colegio de Arquitectos de Castellón [College of Architects of Castellón]

WORK: Integral BIM training for architecture students in their final courses
MISSION: BIM training with Revit (Architecture, Structure and Installations) and BIM Management with Navisworks
DATE: October 2013 - February 2014
CLIENT: Universidad CEU San Pablo [ CEU San Pablo University]

WORK: BIM Training in a Company Technical Office
MISSION: Initiation to BIM technology, practice and BIM implementation into its own projects
DATE: January 2014
CLIENT: Acero estudio [Acero Studio]

WORK: Installations training with BIM technology for professional group
MISSION: BIM training with Revit MEP (Mechanical, Electrical and Plumbing)
DATE: July 2013
CLIENT: Freelancer and professionals, Valladolid (Spain)

WORK: BIM Training in a Company Technical Office
MISSION: Initiation to BIM technology, practice and BIM implementation into its own projects
DATE: 2013
CLIENT: TCH arquitectura [TCH Architecture]

WORK: BIM Training in a Company Technical Office
MISSION: Initiation to BIM technology, practice and BIM implementation into its own projects
DATE: 2013
CLIENT: AIC equip

 

2-PUBLICATIONS

PUBLICATION: Relationship between database and the BIM Model
MISSION: Scientific communication for the National Congress EUBIM 2017 [BIM Users meeting 2017]
DATE: February 2017
ISBN: provisional (abstract)

PUBLICATION: Relationship between database and the BIM Model
MISSION: Business excellence interview with “El Mundo”
DATE: February 2017
DOWNLOAD: http://www.guiadeprensa.com/prensa/EL_MUNDO (publication 22 February 2017)

PUBLICATION: uBIM, Guidelines for BIM Standardisation in Spain
MISSION: Guideline 4 “Installations Design” and Guideline 11 “Project Management”
DATE: October 2014

PUBLICATION: BIM as database in the service of the building life cycle
MISSION: Scientific communication for the National Congress EUBIM [BIM Users meeting]. Minutes book EUBIM 2014
DATE: May 2014
ISBN: 978-84-9048-234-6 (printed version)

PUBLICATION: Use of BIM in the study, planification and management of safety in building works
MISSION: Scientific communication for the National Congress EUBIM [BIM Users meeting]. Minutes book EUBIM 2014
DATE: May 2014
ISBN: 978-84-9048-234-6 (printed version)

PUBLICATION: The advantage of using BIM content
MISSION: Article for a BIM magazine (Knauf Report) published by Knauf España (Knauf Spain)
DATE: Februay 2012

AWARD: 1st prize
MISSION: Competition for preliminary project of a residential building with 226 dwellings, commercial and car parks.
DATE: May 2017- June 2017
ORGANIZATION: EAP arquitectura [EAP architecture] (collaboration as BIM consulting)

AWARD: 3rd prize
MISSION: Ideas competition (Design and integral BIM modelling) for a Health Center in Valladolid (Spain)
DATE: December 2016
ORGANIZATION: Organising Committee of the BIM COMPETITION Valladolid 2016 (Bimtecnia)

AWARD: 1st prize
MISSION: Integral BIM modelling of a public building in Valladolid (Spain)
DATE: November 2015
ORGANIZATION: Organising Committee of the BIM COMPETITION Valladolid 2015

AWARD: 2nd prize
MISSION: Integral BIM modelling of a public building in Valladolid (Spain)
DATE: November 2014
ORGANIZATION: Organising Committee of the BIM Congress Valladolid 2014” From BIM to BIG DATA”

AWARD: Audience award
MISSION: Integral BIM modelling of a public building in Valladolid (Spain)
DATE: November 2014
ORGANIZATION: BIM Congress Valladolid 2014” From BIM to BIG DATA” Organising Committee

AWARD: One of 10 awards selected from among more than 100 contestants
MISSION: Valencian entrepreneurship for the establishment of IBIM
DATE: October 2013
ORGANIZATION: Excmo. Ayuntamiento de Valencia [City Council of Valencia]
CONVENTION: Collaboration with the Dirección general de formación profesional y enseñanzas de régimen especial (Generalitat Valenciana) [General Management of vocational training and special education systems (Regional Government of Valencia)]
MISSION: Tutoring students in their traineeships in companies, regarding informatics
DATE: Since January 2017
ORGANIZATION: Progresa (Integrated Training Centre)

CONVENTION: Collaboration with ABASTOS
MISSION: Tutoring students in their traineeships in companies, regarding BIM
DATE: Since June 2016
ORGANIZATION: Renders Factory

CONVENTION: Collaboration with RF
MISSION: Tutoring students in their traineeships in companies, regarding BIM
DATE: Since June 2016
ORGANIZATION: Renders Factory

CONVENTION: Collaboration with the Fundación Laboral de la Construcción [Labor Foundation of Construction]
MISSION: Tutoring students in their traineeships in companies. Educational action: Supervision and project of works under construction
DATE: Since February 2016
ORGANIZATION: Fundación Laboral de la Construcción de la Comunidad Valenciana [Labor Foundation of Construction of Comunidad Valenciana]

CONVENTION: Collaboration with the Universidad Politécnica de Valencia (Arquitectura Técnica and Ingeniería Informática schools) [Polytechnic University of Valencia (Technical Architecture and IT engineering schools)]
MISSION: Tutoring students in their traineeships in companies
DATE: Since January 2015
ORGANIZATION: Universidad Politécnica de Valencia [Polytechnic University of Valencia]

CONVENTION: Collaboration with the development and support department of Presto
MISSION: Help to refine and optimize the “Cost-it” software tool (Presto plugin for Revit)
DATE: Since January 2015
ORGANIZATION: Soft

CONVENTION: Collaboration with the development and support department of Cype
MISSION: Assistance in the “migration to BIM” from the existing developed software
DATE: Since Juny 2014
ORGANIZATION: Cype Ingenieros [Cype Engineering]

CONVENTION: Collaboration with the development and support department
MISSION: Assist in the “migration to BIM” from the existing developed software
DATE: Since Juny 2014
ORGANIZATION: Leica Geosystems

 

TITLE: BIM methodology implementation. The experience in successful cases.
MISSION: Masterclass, supported by real cases, as part of the cycle organized by the subject “Modelling and integration of construction information (BIM)” included in the university Master’s with recognition of international excellence in Civil engineering planning and management, for students of the Master’s Degree in Planning and Integrated Management. Civil Engineering (BIM use applied to Civil and Structural engineering)
DATE: June 2017
PLACE: Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos (UPV) [School of Civil Engineering (Polytechnic University of Valencia)]

TITLE: BIM, national and international scene RESUMEN DEL PPT
MISSION: BIM Day for the collective of architects, showing the initiative “es.bim” by the Ministerio de Fomento [Ministry of Development] and the BIM training strategy of the group, fostered by the College of Architecs.
DATE: November 2015
PLACE: Colegio Territorial de Arquitectos de Valencia [College of Architects of Valencia]

TITLE: Ubim Initiative -13 guidelines for BIM standarisation in Spain
MISSION: Presentation of the first edition of the spanish BIM standarisation guidelines
DATE: October 2014
PLACE: Instituto Eduardo Torroja [Eduardo Torroja Institute]

TITLE: Use of BIM in small technical offices
MISSION: Presentation of BIM use to GURSEV (Grupo de Usuarios de Revit de Sevilla) [ BIM Users Group of Seville]
DATE: July 2014
PLACE: On-line

TITLE: BIM, a methodology that revolutionizes the way of making construction projects
MISSION: Presentation of BIM use in the 6th Forum of the Plataforma Tecnológica de la Construcción [Construction Technology Platform]
DATE: June 2014
PLACE: Escuela Técnica Superior de Ingenieros de Caminos, Canales y Puertos (UPV) [School of Civil Engineering (Polytechnic University of Valencia)]

TITLE: BIM as Database to the service of building lifecycle
MISSION: Presentation of scientific communication selected by the jury, National Congress EUBIM [BIM Users meeting]
DATE: May 2014
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

TITLE: IBIM, Applied BIM professionals
MISSION: Presentation of IBIM (first BIM Consulting in Valencia) in the National Congress EUBIM [BIM Users meeting]
DATE: May 2014
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

TITLE: The truths of BIM
MISSION: Presentation of use of BIM in small technical offices
DATE: April 2013
PLACE: Colegio Territorial de Arquitectos de Valencia [College of Architects of Valencia]

MISSION: Bronze sponsorship in the 4th BIM Congress EUBIM 2015 [BIM Users meeting 2015] in Valencia
DATE: May 2015
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]
WEB: http://www.eubim.com/2015/patrocinadores.html

MISSION: Silver sponsorship in the 3rd BIM Congress EUBIM 2014 [BIM Users meeting 2014] in Valencia
DATE: May 2014
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]
WEB: http://www.eubim.com/2014/patrocinadores.html

MISSION: Bimmate members, professional collaborative platform of advance BIM modelling
DATE: beginning in May 2016

MISSION: Members of the strategy, technology and processes working groups of the initiative “es.bim”, fostered by the Ministerio de Fomento [Ministry of Development] for the BIM Implementation in Spain. Co-responsible for the subgroup 1.4 “Tracking of BIM Use” http://www.esbim.es/
DATE: Since the foundation of the “Instituto Eduardo Torroja”[Eduardo Torroja Institute] in October 2015, to the present
PLACE: Instituto Eduardo Torroja [Eduardo Torroja Institute]

MISSION: Internship tutoring, agreement with Progresa (Integrated training center). Web and networks programming.
DATE: 2017 (1 student)
PLACE: UPV (Polytechnic University of Valencia)- IBIM head office

MISSION: Internship tutoring, agreement with UPV (Polytechnic University of Valencia). Programming and data base connection to BIM models
DATE: 2016 (1 student)
PLACE: UPV (Polytechnic University of Valencia)- IBIM head office

MISSION: Internship tutoring, agreement with RendersFactory. BIM modelling and model data base structure.
DATE: 2016 (1 student)
PLACE: UPV (Polytechnic University of Valencia)- IBIM head office

MISSION: Internship tutoring, agreement with UPV (Polytechnic University of Valencia). BIM modelling and model data base structure.
DATE: 2015 (3 students); 2016 (2 students)
PLACE: UPV (Polytechnic University of Valencia)- IBIM head office

MISSION: Internship tutoring, agreement with Abastos (Vocational training). Data base management and web
DATE: 2016-2017 (1 student). Final mark: Honors qualification
PLACE: IBIM head office

MISSION: Internship tutoring, agreement with Abastos (Vocational training). BIM Modelling and model data base connection through Revit API (Application Programming Interface)
DATE: 2015-2016 (1 student). Final mark: Honors qualification
PLACE: IBIM head office

MISSION: Internship tutoring, agreement with “Fundación Laboral de la Construcción) [Construction Labor Foundation]. BIM Modelling and model data base structure.
DATE: 2016 (2 students)
PLACE: IBIM head office

MISSION: Members of the Organizing Committee of the National BIM Congress EUBIM [BIM Users meeting], which is held annually in Valencia
DATE: May each year, uninterruptedly since 2012 (6 editions, in 2012, 2013, 2014, 2015, 2016 and 2017)
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

MISSION: Responsible for the organization of the round table: Measurement of a BIM model, within the BIM Users Meeting in Spain, EUBIM 2017. http://www.eubim.com/encuentro-usuarios-bim.html
DATE: May 2017
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

MISSION: Responsible for the organization of Workshops ( Lumion, Point Clouds and BOQ) in the EUBIM 2015 [BIM Users meeting 2015] http://www.eubim.com/2015/noticias-talleres.html
DATE: May 2015
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

MISSION: Responsible for the organization of the BOQ Workshop in the EUBIM 2014 [BIM Users meeting 2014]
DATE: May 2014
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]

MISSION: Members of the Experts Committee of the uBIM Guideline for BIM Standarization in Spain. As well as responsible for chapters number 4 and 11 and coordinators of five guideline chapters. https://www.buildingsmart.es/bim/guías-ubim/
DATE: Since May 2013 (currently effective)
COMMENTS: Collaboration with more than 80 professionals on a national level

MISSION: Founding members of the GURV (Grupo de Usuarios de Revit de España) [Group of Revit Users in Spain].
DATE: April 2010
PLACE: Escuela Técnica Superior de Edificación (UPV) [Technical School of Building Management (Polytechnic University of Valencia)]